Containing by weight 0.6 percent or more of carbon
Verified against the Commerce and tariff-schedule data as of 2026-09-07. All published HS codes
0%
not stated as an ad valorem rate — check the schedule
Base schedule rates for HS 7213.91.45 — trade-remedy programs below stack on top, and USMCA requires the good to actually qualify under the rules of origin.
Programs naming HS 7213.91.45, each with the instrument that set it:
25% — origins: CN — effective 2024-09-27
Broker verification required. An HTS number appearing on an AD/CVD order's public case page, on Commerce's Active Case data, or on Triangle's own order-to-HTS mapping does NOT establish that a specific product is within that order's scope. Only Commerce's written Scope of the Order narrative — or a scope ruling issued under 19 CFR 351.225 — is dispositive. Triangle surfaces the order's documents and this caveat; it never issues its own in-scope or out-of-scope verdict.
Listing on a case page is not proof of coverage — the order's written scope decides that. The documents below are where that text lives.
Belarus. Carbon and Alloy Steel Wire Rod. Effective 2018-01-24. Phase: order.
Brazil. Carbon and Certain Alloy Steel Wire Rod. Effective 2002-10-29. Phase: order.
Brazil. Carbon and Certain Alloy Steel Wire Rod. Effective 2002-10-22. Phase: order.
China. Carbon and Certain Alloy Steel Wire Rod. Effective 2015-01-08. Phase: order.
China. Carbon and Certain Alloy Steel Wire Rod. Effective 2015-01-08. Phase: order.
Indonesia. Carbon and Certain Alloy Steel Wire Rod. Effective 2002-10-29. Phase: order.
Italy. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: order.
Italy. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: order.
Mexico. Carbon and Certain Alloy Steel Wire Rod. Effective 2002-10-29. Phase: order.
Moldova. Carbon and Certain Alloy Steel Wire Rod. Effective 2002-10-29. Phase: order.
Russia. Carbon and Alloy Steel Wire Rod. Effective 2018-01-24. Phase: order.
South Africa. Carbon and Alloy Steel Wire Rod. Effective 2018-03-14. Phase: order.
South Korea. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: admin_review.
Spain. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: order.
Trinidad and Tobago. Carbon and Certain Alloy Steel Wire Rod. Effective 2002-10-29. Phase: order.
Türkiye. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: order.
Türkiye. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: order.
Ukraine. Carbon and Alloy Steel Wire Rod. Effective 2018-03-14. Phase: order.
United Arab Emirates. Carbon and Alloy Steel Wire Rod. Effective 2018-01-24. Phase: order.
United Kingdom. Carbon and Alloy Steel Wire Rod. Effective 2018-05-21. Phase: order.
20 scope-of-the-order narratives and 7 published scope rulings or circumvention determinations published by Commerce for the orders above — precedent to read, not a verdict about yours.
The programs and orders above name HS 7213.91.45 — not what a specific entry costs. Run it through the free Tariff Calculator for the stacked, cited total and a dated Entry Memo.